Technical Documents
Technical Reports prepared by the Project Study Group (PSG) will be posted here as applicable.
Purpose and Need
Alternatives to be Carried Forward (ATBCF)
The Alternatives to be Carried Forward report refers to alternatives prior to their new naming conventions. A guide for the past and present alternatives naming convention is available here.
- Alternatives to be Carried Forward Technical Memorandum (2020)
- Appendix A – Context Tailored Treatments Evaluation
Appendix B
“The Essential”
Context Tailored Treatments with Transit Advantages (CTT+TA)
- North CTT+TA Plans (Montrose Ave. to Hollywood Ave.)
- Central CTT+TA Plans (Diversey Pkwy. to Montrose Ave.)
- South CTT+TA Plans (Grand Ave. to Diversey Pkwy.)
Appendix C
“The Addition”
Dedicated Transitway-Left (DTW-L)
- North DTW-L Plans (Montrose Ave. to Hollywood Ave.)
- Central DTW-L Plans (Diversey Pkwy. to Montrose Ave.)
- South DTW-L Plans (Grand Ave. to Diversey Pkwy.)
Appendix D
“The Exchange”
3+1 Bus Only Lane (3+1 BOL)
- North 3+1 BOL Plans (Montrose Ave. to Hollywood Ave.)
- Central 3+1 BOL Plans (Diversey Pkwy. to Montrose Ave.)
- South 3+1 BOL Plans (Grand Ave. to Diversey Pkwy.)
“The Flex”
3+1 Managed Lane (3+1 ML)
- North 3+1 ML Plans (Montrose Ave. to Hollywood Ave.)
- Central 3+1 ML Plans (Diversey Pkwy. to Montrose Ave.)
- South 3+1 ML Plans (Grand Ave. to Diversey Pkwy.)
“The Double Flex”